Description
Localisation
Caractéristiques
Impôts et taxes
Certificat énergétique
Description
Currently, under the current urban development plan, the plot is classified as unconsolidated urban land, making construction unfeasible. It is awaiting a PERI (Special Interior Reform Plan), meaning it would need an urbanization project, and the initiative would be cooperative, which means it doesn't solely depend on the owner. It is worth mentioning that in the 2010 urban plan, which was annulled, this plot was designated for public facilities, but that doesn't mean the new plan being drafted will assign the same use.
In summary, it is a plot with no approved planning or management, and in the current situation, construction licenses would not be granted. The plots in the same area that are being built either had a license before 2015 or are out of planning scope and fall under specific regulations.
The new Marbella urban development plan is currently in the preliminary stage, which means it neither classifies nor qualifies the land yet. We will have to wait for the initial approval phase to know more about the classification of the plot in the new plan.
Localisation
Caractéristiques
Orientation
Sud
Points de vue
Mer
Paramètres
Bord de mer
Près de la mer
Près des commerces
Près des écoles
Utilitaires
L'électricité
Eau potable
Catégorie
Investissement
Impôts et taxes
Frais de communauté : €0 / monthly
Taxe Basura : 0 € / an
Frais de l'IBI : 0 € / an
Taxe Basura : 0 € / an
Frais de l'IBI : 0 € / an
Certificat énergétique